Product family MPO cabling

MPO trunks, harnesses and cassettes for data centers

ZeroLine Connect supplies pre-terminated MPO cabling for data centers: trunks of 8, 12, 16 or 24 fibers, MPO-to-LC harnesses, cassettes and high-density panels, in OS2 and OM3 to OM5 fiber. Every assembly is built to your polarity method, tested for insertion loss and labelled to your rack and port plan. MTP® connectors from US Conec are available on request.

Fibers per MPO connector
8–24
Polarity methods to TIA-568
A · B · C
Insertion-loss test report
Per assembly
Elite-grade MPO on request
Low-loss

Specification

What we supply

Overview
ItemOptions
TrunksMPO–MPO, 8/12/16/24 fibers, pinned or unpinned, multiple connectors per end
Harnesses (fan-outs)MPO to LC or SC duplex
CassettesMPO to LC, 12 or 24 fibers, Base-8 or Base-12
Panels1U to 4U, 96 to 144+ fibers per U
Conversion modulesBase-8 to Base-12, 24 to 2×12
AccessoriesLoopbacks, adapters, cleaning tools
Polarity methods (TIA-568)
MethodTrunkHow it works
AType A, key up to key downStraight-through trunk; an A-to-B patch cord at one end and an A-to-A cord at the other
BType B, key up to key upFiber 1 lands on fiber 12; A-to-B cords at both ends
CType C, pair-flippedEach pair flipped inside the trunk; A-to-B cords at both ends

Pick one method for the whole site and stay with it. Parallel optics such as 100G SR4 generally use Method B.

Options

  • Lengths to your rack elevations
  • Labels by row, rack and port
  • Low-loss MPO grades
  • Pulling eyes and protective sleeves for trunks

Tests and documents with every order

  • Insertion loss on every connector
  • Polarity verified before packing
  • End-face inspection
  • Packed and labelled by hall or row

Terms

Ordering, testing and delivery

Typical terms. Your offer states the exact terms for your order.

Minimum order

One drum of cable, one reel of fiber or one carton of passive components. Mixed BOMs are welcome. Samples for evaluation typically ship in 1–3 weeks.

Lead time

Stock items 5–10 working days. Made-to-order cable typically 2–4 weeks. Large framework lots ship on the agreed rollout schedule. Fiber prices moved sharply in 2026, so every cable offer states how long its price holds next to the lead time.

Fiber and cable prices in 2026
Test reports

OTDR data for every drum of cable, insertion and return loss for every connectorised assembly, loss and uniformity reports for splitters, and our pre-shipment inspection report. Third-party pre-shipment inspection on request, at the buyer’s cost.

Labelling and packing

Drum and carton labels to your scheme: project, lot, route or rack. Export cartons, and wooden or plywood drums for cable.

Payment

T/T with 30% deposit and 70% before shipment, or L/C at sight. Rollouts can run under a framework agreement with staged lots.

Payment terms and trade finance
Delivery

FOB Wuhan or Shanghai, CIF to your port, or door delivery where available. Goods from other ZeroLine lines ship in the same consignment when that saves freight.

Shipping and compliance

FAQ

MPO cabling: questions buyers ask

Base-8 or Base-12?

Base-8 matches 40G, 100G and 400G parallel optics such as SR4 and DR4, which use 8 fibers, so no fiber goes unused. Base-12 is common in existing installations. New builds for parallel optics usually choose Base-8.

Do you supply MTP® connectors?

Yes, on request. MTP is US Conec’s high-performance MPO connector. Standard MPO connectors are compatible and cost less.

Get a matched quote

Quote MPO cabling

Upload a spreadsheet or tender, or paste the list. We match every line to a qualified factory and return one priced BOM, usually within 3 to 7 working days.

What is it for?